Home Media

College Move-In is Getting an Upgrade

Back to Media

College Move-In is Getting an Upgrade

June 25, 2025

We’re proud to support the full-scale renovation of Warren Towers—Boston University’s largest residence hall—by providing custom-engineered access solutions designed for safety, efficiency, and scale.

This iconic 18-story, three-tower complex is being renovated in phases, with work scheduled during the winter months and construction taking place throughout the summer. For Tower A, our teams collaborated to deliver a tailored solution that includes:

  • Construction elevators
  • Loading dock
  • Rapid-EPS® Edge Protection System
  • Scaffolding and stair towers
  • Aluma Systems sidewalk overhead protection
  • HAKI® temporary roofing

Our system will enable crews to safely perform masonry repairs and restoration, replace all windows and roof drainage, update plumbing and infrastructure, install air conditioning for all dorm rooms, and more. Renovation of the remaining towers and dining hall is scheduled for completion by Fall 2028.

 

Thank you message!